Developer

01

Sewerage Work Approvals

 

IWK has been appointed by Suruhanjaya Perkhidmatan Air Negara (SPAN) as Certifying Agency for Sewerage Works Approvals in accordance to Section 174 of Water Services Industry Act 2006 (Act 655) for all states in West Malaysia and Wilayah Persekutuan Labuan  effective 1 January 2008.

Need help with sewerage planning and submission process? Register with us for MSIG Workshop on Requirements for Planning, Design & Construction of Sewerage System.

02

Certifying Agency

For more information, please contact the following state office :
Kelantan
Person In Charge Nur Hazlin Binti Mahmood
General Enquiry Nik Samila Binti Nik Man
Address Pejabat Cawangan
Lot 188A, Jalan Tengku Ismail off Jalan Telipot, Seksyen 21, Kelantan, 15200 Kota Bharu
Tel. No. 09-7462811/09-7462816
Fax No. 09-7462820
Local Authority Majlis Perbandaran Kota Bharu Bandaraya Islam, Majlis Daerah Bachok, Majlis Daerah Dabong, Majlis Daerah Gua Musang, Majlis Daerah Jeli, Majlis Daerah Ketereh, Majlis Daerah Kuala Krai, Majlis Daerah Machang,Majlis Daerah Pasir Mas,Majlis Daerah Pasir Puteh,Majlis Daerah Tanah Merah,Majlis Daerah Tumpat
Customer Day Wednesday (9am - 1pm)
Kedah/Perlis
Person In Charge Ir. Shaiful Ezan Omar
General Enquiry Rusyida Shuib
Address Kedah/Perlis Certifying Agency Office
Indah Water Konsortium Sdn Bhd Loji Pengolahan Enapcemar Berpusat Kota Setar (KSR169) Jalan Lencong Timur Tanjung Bendahara 05300 Alor Setar, Kedah
Tel. No. 04-772 4454 / 04-771 8671
Fax No. 04-772 7458
Local Authority MP Kangar, MB Alor Star, MD Kubang Pasu, MD Padan Terap, MD Sik, MD Pendang, MP Sungai Petani, MD Yan, MD Baling, MP Kulim, MD Bandar Baharu, MP Langkawi Bandaraya Pelancongan
Customer Day Tuesday (9.00am - 1.00pm)
Pulau Pinang
Person In Charge Mohd Fahril Azri Mohd Rodzi
General Enquiry Kanagamani Maniam
Address Pulau Pinang Certifying Agency Office
Loji Rawatan Kumbahan Serantau (SPI503), Jalan Limbungan, Off Jalan Chain Ferry, 12100 Butterworth, Pulau Pinang
Tel. No. 04-3325481
Fax No.
Local Authority MB Pulau Pinang, MP Seberang Perai
Customer Day Thursday (9.00am-12.00pm)
Perak
Person In Charge Sri Ruthira Kumar a/l Amirthalingam
General Enquiry Aniza Mohd Hashim
Address Perak Certifying Agency Office
A-3A-3A, Block A, Green Town Square, Jalan Dato' Seri Ahmad Said, 30450 Ipoh, Perak Darul Ridzuan.
Tel. No. 05-254 6497
Fax No. 05-254 3071
Local Authority MB Ipoh, MP Taiping, MD Pengkalan Hulu, MD Grik, MD Selama, MD Lenggong, MP Kuala Kangsar, MD Kerian, MD Perak Tengah, MD Kinta Barat, MD Kinta Selatan, MP Manjung, MP Teluk Intan, MD Tapah, MD Tanjung Malim
Customer Day Friday (9am - 12pm)
Federal Territory
Person In Charge Adnan Madon
General Enquiry Marsitah Mohd Yassin
Address Federal Territory Certifying Agency Office (Kuala Lumpur & Putrajaya)
Loji Rawatan Kumbahan Serantau (KLR347)
Jalan Chan Chin Mooi
Titiwangsa 53200 Kuala Lumpur

Federal Territory Certifying Agency Office (Labuan) Lot 1, Tingkat Mezzanine
Bangunan Tabung Haji
Jalan Bunga Kesuma
P.O Box 80305
87012 W.P. Labuan
Malaysia
Tel. No. 03-4031 0626, 03-4031 4353, 03-4031 1059 (Kuala Lumpur & Putrajaya)

087-421627, 087-421628 (Labuan)
Fax No. 03-4031 0454
Local Authority Perbadanan Putrajaya, MP Labuan, DB Kuala Lumpur
Customer Day Tuesday (9.30am - 1pm)
Selangor
Person In Charge Ir. Azura Megat Ibrahim
General Enquiry Rahina Mohd
Address Selangor Certifying Agency Office
Loji Rawatan Kumbahan Serantau (SAM 272) Off Persiaran Perusahaan Seksyen 23 40000 Shah Alam Selangor Darul Ehsan
Tel. No. 03-5542 4242
Fax No. 03-5541 3551
Local Authority MB Petaling Jaya, MP Ampang Jaya, MP Selayang, MP Kajang, MD Hulu Selangor, MP Klang, MB Shah Alam, MD Sabak Bernam, MD Kuala Selangor, MP Subang Jaya, MD Kuala Langat, MP Sepang
Customer Day Thursday (9am - 1pm and 2pm-4.30pm)
Negeri Sembilan
Person In Charge Nor Azura Massabir Ali
General Enquiry Norhasmah Hasnan
Address Negeri Sembilan Certifying Agency Office
No. 34 & 35 (Tingkat Atas), Jalan Dataran Kemuning 2, Dataran Kemuning, Senawang, 70450 Seremban, Negeri Sembilan Darul Khusus
Tel. No. 06 - 6789 054
Fax No. 06 - 6789 057
Local Authority MP Nilai, MD Jelebu, MD Jempol, MD Kuala Pilah, MD Rembau, MP Seremban, MP Port Dickson, MD Tampin
Customer Day Monday (9am - 1pm)
Melaka
Person In Charge Shamsul Hisham Abu Bakar
General Enquiry Salmila Janudin
Address Melaka Certifying Agency Office
RSTP Bandaraya Melaka Pt 1819, Jalan Syed Abdul Aziz Kawasan Bandar VI Daerah Melaka Tengah 75000 Melaka
Tel. No. 06-2888561
Fax No. 06-2888562
Local Authority MB Melaka Bersejarah, MP Jasin, MP Alor Gajah, Majlis Perbandaran Hang Tuah Jaya
Customer Day Wednesday (9.00am - 4.00pm)
Johor
Person In Charge Ir. Sulaiman Mohamed Daud
General Enquiry Faiza Md Sairan
Address Johor Certifying Agency Office
Loji Rawatan Kumbahan (JBT162), Lot 124864, Jalan Impian Emas 20, Taman Impian Emas, 81300 Skudai Johor
Tel. No. 07- 5591 409
Fax No. 07- 5591 411
Local Authority MD Segamat, MD Labis, MD Tangkak, MP Muar, MP Kluang, MD Simpang Renggam, MD Yong Peng, MP Batu Pahat, MD Pontian, MP Kulai, MP Johor Bahru Tengah, MD Kota Tinggi, MD Mersing, Majlis Bandaraya Johor Bahru, Majlis Bandaraya Pasir Gudang
Customer Day Wednesday (9.00am - 4.30pm)
Pahang
Person In Charge Rosafizi Mokhtar
General Enquiry Roziah Idris
Address Pahang Certifying Agency Office
Loji Rawatan Kumbahan (KUN355),
Jalan KS 2/2, Kota Sultan Ahmad Shah,
25200 Kuantan, Pahang Darul Makmur.
Tel. No. 09-5177194; 09-5177215
Fax No. 09-5177226
Local Authority MP Kuantan, MD Cameron Highlands, MD Lipis, MD Jerantut, MD Raub, MD Maran, MP Temerloh, MP Bentong, MD Pekan, MD Rompin, MD Bera
Customer Day Friday (9am - 12pm)
Terengganu
Person In Charge Nur Hazlin Binti Mahmood
General Enquiry Mastura Aini Zahid
Address Terengganu Certifying Agency Office
Loji Rawatan Kumbahan (KTU185)
Muara Utara, Kg. Hujung Tanjung
Seberang Takir, 21300 Kuala Terengganu
Terengganu Darul Iman
Tel. No. 09-624 8278 / 09-624 8279
Fax No. 09-624 8280
Local Authority MP Kuala Terengganu, MD Besut, MD Setiu, MD Marang, MD Hulu Terengganu, MD Dungun, MP Kemaman
Customer Day Sunday (9am - 12pm)

04

Sewerage Forms

  • Form Notification for Connection To Public Sewer DOWNLOAD
  • Report Format for HAZOP Study and Checklist DOWNLOAD
  • HAZOP Checklist for Sewage Treatment Plant DOWNLOAD
  • Basic Guide of Sewerage Layout Plan Submission in Digital Format DOWNLOAD
  • Content for Operation and Maintenance Manuals DOWNLOAD
  • Tabular Amounts of Performance Bonds DOWNLOAD
  • Standard Format for Performance Bond DOWNLOAD
  • Bank Guarantee for Upgrading of Existing Public Sewerage System DOWNLOAD
  • Letter of Indemnity for Upgrading Works DOWNLOAD
  • Typical Project Signboard for Upgrading Works DOWNLOAD

05

FAQ for S.W.A.T

 
What is the difference between the new model (Low Risk Approval Procedure) compared to existing procedures?

  1. In line with previous procedures based on MSIG Volume II (2nd Edition-amendment v1: July 2013), the approval procedure for this new model has been simplified by strengthening the role of professional groups (consultants) issuing certificates of compliance under the concept of self-regulation/ self-assessment especially for design specification and site inspection elements.
  2. Currently, only septic tank applications, connections and small sewage treatment systems will be processed based on this new model.
  3. This new model approval procedure involves only two processes namely Sewerage Works Approval Application (SWA) and Sewerage Works Completion (SWC) Certification Notice compared to existing procedures involving five processes. The total charter duration for SWA and SWC is 21 days (14 + 7) compared to 63 days according to existing procedures.
When will the new model be used?

  1. It goes into effect beginning 1 April 2014 for all new planning applications.
  2. For development that has reached the PDC6 submission stage (Start-Work Notice), applicants are allowed to make further applications based on the new SWC submission model.
Are all submissions for septic tank, connections and small sewage treatment systems required to adhere to the new model beginning 1 April 2014?

  1. Until such a date that is set by the Commission, applications for approval based on previous procedures in reference to MSIG Volume II (2nd Edition-amendment v1: July 2013) are still allowed.
  2. However, applicants are allowed to apply the new model for the remainder of the approval processes provided that they have completed the approval process up to level PDC6 before submitting the SWC.
What about the processing fee payment procedure for this new model?

  1. The payment procedure is unchanged as stipulated in Article 3.0 of MSIG Volume II (2nd Edition-amendment v1: July 2013).
  2. However, the details of the processing fee amount for SWA and SWC should refer to Table 1 stated in Article 4.0 of MSIG Volume II Appendix [Special Edition 2014 (Low Risk)]
  3. Concurrent full payment of SWA and SWC in one government bank draft/ cheque is allowed.
What does it mean for a connection that is allowed to be processed under this new model?

  1. Connection here means the application of an extension of the internal pipe from the inspection chamber/ manhole to the existing sewerage system provided that it does not involve the construction of sewer reticulation.
 
 
  • English
  • Bahasa Malaysia